Planned works ICE International

From Monday 25 to Friday 29 January

ICEs v.v. will be diverted via Mönchengladbach and Venlo and will run according to adjusted schedule and will not call at Düsseldorf, Duisburg, Oberhausen, Arnhem and make an extra stop at Den Bosch and Mönchengladbach. ICE 121 (original departure time 6:38) and 222 (original departure time 5:29) will not run between Amsterdam and Frankfurt. ICE 120 (departure Frankfurt Hbf 19:29) will run the normal route on 29 January. Check the international intinerary reisplanner for the actual times.

Sunday 14 March

ICE 105 (departure time Amsterdam 8:08) and 104 (original departure time Basel SBB 15:13) will not call at Basel SBB and start and terminate in Basel Bad Bf.

Sunday 18 April

Engineering works between Emmerich and Oberhausen: ICE 120 (departure Frankfurt Hbf 19:29) will run to Düsseldorf and will not call at Duisburg, Oberhausen, Arnhem, Utrecht and Amsterdam.

Saturday 1 and Monday 3 May

Engineering works Amsterdam – Utrecht: ICE trains will be redirected and will run according to adjusted schedule.

From Monday 24 to Friday 28 May

Engineering works in Germany: ICE trains will run via Venlo and will not call at Arnhem, Oberhausen, Duisburg, Düsseldorf and Köln Deutz Messe. Extra stop in Den Bosch, Mönchengladbach and Köln HBF. ICE 121 and 222 will not run. ICE 120 will terminate at Köln Deutz Messe.

Need help?